top of page
Runtime: 1m
Designs subject to change.
WAVE-ENABLED IN LESS THAN A DAY
1
CONSULT
We'll work with you to configure your system.
SETUP & TEST
Ready to go in
in a half a day.
TRAIN
Takes one to two hours.
Straightfoward & simple.
READY-TO-GO
Go live and experience safer swimming.
• Nothing goes in your pool except your swimmers
• No permits or licensed contractors required
• Drilling into walls not required.
• Battery-powered or plugged into AC
• Leave in place or take anywhere your swimmers go
2
3
1. Typical experience. Some deployments may take longer.
2. Contractors and permits may be required if your facility chooses to install new wall outlets.
3. Most components may be placed on existing, elevate flat surfaces such as shelves. Minimal drilling is required for wall-mounted equipment.
System Diagram
TOUR A WAVE DEPLOYMENT
READY TO BE "WAVE-SAFE"?
G
etting started with WAVE is simple. After a brief assessment of your needs, we'll help you configure the right system for your facility.
Within just a few hours (and without any need for permits or pool closings) your system will be up and running. Watch the video.
Although using WAVE is remarkably easy, our team will be on hand to train your staff and help introduce the system to your patrons.
Fill out this form to provide more details
about your facility and your specific needs.
bottom of page